Search | Site Map | Contact Us | Home
Georgia Power

Construction Views

Photo
A long section of the pipeline is suspended above the ground.
Photo
The pipe, 30 inches in diameter, is pulled underground from the other side of the Chattahoochee River.
Photo
The 40-foot sections of pipe are welded together before going underground.
Photo
Workers make sure the pipe sections are fitted together properly.
Photo
Here the pipe is suspended over a small creek, but will eventually be in the ground.