Construction Views
![]() A long section of the pipeline is suspended above the ground. |
![]() The pipe, 30 inches in diameter, is pulled underground from the other side of the Chattahoochee River. |
![]() The 40-foot sections of pipe are welded together before going underground. |
![]() Workers make sure the pipe sections are fitted together properly. |
![]() Here the pipe is suspended over a small creek, but will eventually be in the ground. |




