Plant Vogtle Units 3 and 4 are the first nuclear plants to be built in the United States in 30 years. The photo gallery highlights the progress of the construction through pictures. You can search the gallery by category or keyword. You may also click on an image to enlarge or download. Please bookmark this page for future access, and revisit regularly as photos will be added on an ongoing basis.

Search By: Category Keyword

February 2017

Vogtle Unit 3 containment vessel ring 3 (center), with Unit 3 containment vessel top head (left). Vogtle Unit 3 containment vessel ring 3 Construction of Vogtle Unit 3 turbine building Vogtle Unit 3 containment vessel Vogtle Unit 3 nuclear island Vogtle Unit 3 nuclear island Refueling hatch for Vogtle Unit 3 Inside Vogtle Unit 3 containment vessel Inside Vogtle Unit 3 containment vessel Inside Vogtle Unit 3 containment vessel Inside Vogtle Unit 3 containment vessel Working inside Vogtle Unit 3 containment vessel Vogtle Unit 3 nuclear island Vogtle Unit 3 nuclear island Vogtle Unit 3 nuclear island with Unit 3 turbine building in background Vogtle Unit 3 nuclear island, with annex building construction in foreground Rebar inside the Vogtle Unit 3 containment vessel Looking up from inside the Vogtle Unit 3 turbine building Vogtle Unit 3 turbine building Vogtle Unit 3 transformers Vogtle Unit 3 nuclear island Vogtle Unit 3 steam generator B Vogtle 3&4 construction site Vogtle Unit 3 (right) and Unit 4 (left) Looking inside Vogtle Unit 3 Vogtle Unit 4 nuclear island (left) and turbine building (right) Looking inside Vogtle Unit 4 Vogtle 3&4 construction site, with operating units 1&2 on right Vogtle 3&4 construction site

January 2017

Unit 3 Nuclear Island (left) and Turbine Building (right). Construction of the Vogtle Unit 3 Annex Building. Construction of the Vogtle Unit 3 Annex Building. Construction of the Vogtle Unit 3 Annex Building. Construction of the Vogtle Unit 3 Annex Building. Construction continues on the Vogtle Unit 3 Auxiliary Building. Construction of the Vogtle Unit 3 east shield building wall continues to progress. Diesel oil storage tanks for the new Vogtle units, with Unit 3 switchyard on the left. Vogtle Unit 3 Turbine Building. Siding installation on the Vogtle Unit 3 Turbine Building. Siding installation on the Vogtle Unit 3 Turbine Building. Inside Vogtle Unit 3 containment vessel. Inside Vogtle Unit 3 containment vessel. Vogtle Unit 4 CA03 module. Vogtle Unit 4 CA02 module inside the Module Assembly Building. A worker sprays protective coating inside Vogtle containment vessel ring. Aerial view of the Vogtle 3 and 4 construction site. Aerial view of the Vogtle Unit 3 nuclear island and turbine building. Aerial view looking inside Vogtle Unit 3 containment. Aerial view of the Vogtle Unit 4 nuclear island and turbine building. Aerial view looking inside Vogtle Unit 4 containment. Aerial view of the Vogtle 3 and 4 construction site.
For Additional Photos Visit the Photo Archive

Back to Top ↑