Plant Vogtle Units 3 and 4 are the first nuclear plants to be built in the United States in 30 years. The photo gallery highlights the progress of the construction through pictures. You can search the gallery by category or keyword. You may also click on an image to enlarge or download. Please bookmark this page for future access, and revisit regularly as photos will be added on an ongoing basis.

Search By: Category Keyword

November 2016

South wall removed from Module Assembly Building in preparation for Unit 4 CA01 placement Pre-fabricated concrete floor panel assembly area south of the MAB Unit 4 CA01 inside the Module Assembly Building Integrated Head Package inside the Module Assembly Building Workers assemble scaffolding around the integrated head package in the Module Assembly Building Unit 4 CA02 is assembled inside the MAB Ironworkers installing rebar on the Unit 3 Turbine Island First Bay walls Ironworkers discussing rebar installation for the Unit 3 Auxiliary Building floors in Area 2 at the 100’ elevation Unit 3 Annex Building Battery Room construction Unit 3 Annex Building Area 3 Unit 3 Annex Building Wall 3 form work installation by carpenters in preparation for concrete placement to El. 117’ Safety is the top priority on the Vogtle 3 and 4 project Unit 3 Annex building Unit 4 Unit 3 Unit 4 annex building foundation work Unit 4 nuclear island and beginning of the annex building CA04 and CA05 inside the Unit 4 containment vessel Unit 4 turbine building Unit 4 circulating water pipe Unit 3 Nuclear Island and annex building Unit 3 Annex building Unit 3 containment east side Unit 3 fuel Transfer canal section of CA01 in containment Unit 3 reactor vessel cavity and Unit 3 turbine building in the background One of two Moisture Seperator Reheaters. Both were recently installed in the Unit 3 turbine building Unit 3 turbine building Unit 3 turbine building - moisture separator reheater and feed water heaters A look at Unit 3 annex building (left) and containment (right) from the turbine building A view from EL 196' in the Unit 3 turbine building - Deaerator to right, Turbine Deck below Unit 4 tranformer pads and enclosures A Unit 4 CA03 module sits on the upender in preparation for upending at the pad Unit 4 Reactor Vessel Unit 3 Reactor Vessel is prepared for placement in late November

October 2016

An aerial view of the Vogtle 3 and 4 construction site. An aerial view of Unit 3 nuclear and turbine island with Unit 4 in the background. An aerial view of Unit 3 nuclear and turbine island with Unit 4 in the background. An aerial view looking straight down into the nuclear island and containment of Unit 3. An aerial view of Unit 4 nuclear island and turbine building. An aerial view looking straight down into the nuclear island and containment of Unit 4. Both cooling towers frame a view of the Vogtle 3 and 4 construction from an aerial perspective. Containment ring sections with the Unit 4 cooling tower in the background. The area inside the Unit 3 nuclear island where the reactor vessel will be placed. A construction team member welds equipment inside the Unit 3 nuclear island. Two iron workers safely traverse walls of rebar inside the Unit 3 nuclear island annex area. A view inside the Unit 3 nuclear island of rebar and structural steel going vertical. After a traditional Topping Out ceremony, the final roof truss is lifted to the top of the Unit 3 turbine building. The heavy lift derrick guides the final roof truss toward the Unit 3 turbine building. Workers await the final roof truss, which will raise the Unit 3 turbine building to its maximum height of 254 feet. Workers prepare to set the final roof truss atop the Unit 3 turbine building.
For Additional Photos Visit the Photo Archive

Back to Top ↑